Chiswick
Second floor extension has been built. Stairs been restructured at second floor landing, remodelled to fit walk-on glass panel and structure strengthening to fit glass balustrade. Work includes further installing new engineered flooring in the bedrooms and full house decoration including walls and woodwork. New Velux windows fitted in the dormer room and boiler been relocated to a storage area. Built-in wardrobe was built in third bedroom. New electrical wiring work carried out with new plumbing and new boiler fitted. Project completed in 8 weeks.
All Rights Reserved | Tamasi LTD